SMV / SAM Calculator

Formula: Basic Time (min) = Observed Time (sec) × (Rating% / 100) ÷ 60 · SMV = Basic Time × (1 + Allowance% / 100)

Tip: Typical sewing allowance 10–20% (machine + personal + fatigue)

Throughput / Target Pieces per Hour

Per-task PPH = (WorkMin/SMV)×Eff · Line PPH uses bottleneck SMV
Capacity status: —
# Task Name Machine Operation Type Observed Time (sec) Rating (%) Basic Time (min) Allowance (%) SMV / SAM (min) PPH (task)
Totals 0.00 0.00 0.00
Bottleneck SMV 0.00 0.00
Target PPH 0 0.00